WEST BRIDGFORD · RUSHCLIFFE NG2
Composite and timber decking built across West Bridgford, Lady Bay and Edwalton — including the substructure underneath, which is the part that decides how long a deck lasts. Old deck removed and taken away as part of the job.

*Terms and conditions apply to our 12 month guarantee.
RECENT WORK IN WEST BRIDGFORD
Three stages of the same West Bridgford job. We have shown the frame deliberately — it is what you are actually paying for, and it is the thing you cannot inspect once the boards are down.
Substructure, boards and the finished deck

The frame going in. This is the part nobody sees and the part that fails. Joist spacing, ventilation underneath and how the frame is supported decide whether a deck is solid in ten years — not which boards go on top of it.

Boards going down onto the finished frame. Composite needs wider support than timber in some ranges and closer support in others, so the frame is set out for the boards being used rather than to a standard spacing.

The finished deck in use. Getting the height right against the back door threshold and the lawn is what makes a deck feel like part of the house rather than a platform parked in the garden.
West Bridgford gardens are well suited to decking. Plenty of them fall away from the house, and a deck is often the cheapest way to get a level, usable area off the back door without excavating and retaining half the garden. Others are flat but overlooked, where a deck defines a seating area rather than solving a level problem.
We build both composite and timber, and we build the substructure ourselves rather than laying boards over whatever is already there. That is the difference that matters — a deck fails from underneath, and the frame is the part you cannot inspect once it is finished.
Old decking is removed and taken away as part of the job. We are a registered waste carrier, licence CBDL636235.
Composite costs meaningfully more up front. It does not need oiling or staining, does not splinter, holds colour well past ten years, and most ranges have a textured or grooved surface with better grip when wet. It gets warm in direct sun and it is heavier, which the frame has to account for.
Softwood timber is the cheapest way to get a deck. It needs cleaning and re-treating on a cycle, it silvers if you let it, and smooth boards get genuinely slippery in a wet winter. It is the right answer where budget matters more than maintenance, and it can be replaced board by board.
Hardwood sits between the two — considerably more durable than softwood, beautiful, needs oiling to keep its colour, and costs accordingly.
Our honest steer: if you will actually re-treat it, timber is fine and cheaper. If you know you will not, buy composite. The most common regret we see is a softwood deck that was never treated, green with algae by year three.
Almost every failed deck we take up failed underneath, not on top. What we build into the substructure:
This is the part people are most often unaware of, and it is free to check.
A raised platform or deck can require planning permission in its own right once it is above a certain height above ground — and on a garden that falls, a deck that is level with the back door can be well above ground at the far end. Overlooking a neighbour's garden is a planning consideration too, which is precisely what a raised deck can create.
Once a deck is raised, edge protection stops being a design choice. A balustrade built in as part of the frame is far cheaper and looks considerably better than one added afterwards, so decide at quote stage rather than later.
Parts of West Bridgford also sit within conservation areas. We are not planning consultants and will not guess at your property's status — Rushcliffe Borough Council's planning team will confirm it at no cost, and it is worth the phone call before ordering materials.
An old deck is a surprising volume of waste — boards, joists, posts and often concrete. It cannot go in the garden waste bin: treated timber is not garden waste, and composite certainly is not.
West Bridgford is in Rushcliffe Borough, where the garden waste subscription runs around £47 for the first bin and £37 for a second, fortnightly with no collections over Christmas and New Year. The tip is Rugby Road, NG2 7HA, a Nottinghamshire County Council site requiring vehicle registration in advance and a permit for a van or trailer 24 hours ahead. No trade waste is accepted.
Where waste has come from work carried out by a tradesperson, disposing of it is that tradesperson's legal responsibility, not yours. We take the old deck away as part of the job — registered waste carrier, licence CBDL636235.
We are a local, family-run firm run by founders Adam and Stephen, based on Beechdale Road with over 15 years' experience. We build the frame as well as laying the boards, and we will show you the substructure before it is covered — it is the part you are paying for and the part you will never see again.
*Terms and conditions apply to our 12 month guarantee.
We build decking across Rushcliffe and the wider city:
All Rights Reserved | Nottingham Fencing & Gates Ltd Trading as Nottingham Fencing © 2026
Company Reg. 16650516
Waste Carriers Licence No. CBDL636235
Registered Office address: 162 Beechdale Road, Nottingham, NG8 3FH, United Kingdom